
The town already has $30,000 set aside for the work following last summer's Kraft Celebration Tour. Fixing up the field is part of a proposed three phase project which includes adding a storm sewer system on Oak Street to intercept water from flowing onto the field. The cost to do that is around $70,000. The three phase project could cost as much as $200,000 to complete.