The next few weeks could be slow moving around a section of
upper Aberdeen Road. The Town of Bridgewater will be doing some water and sewer
upgrades on the busy street. Work begins on Monday and should last for the next five weeks. It means a section of upper Aberdeen Road will be closed to
through traffic between the North Street/Glen Allen Drive intersection and
Miller Drive. Motorists should think about using alternative routes
whenever possible to minimize traffic congestion.